A. Eberle GmbH & Co. KG
Manufactures voltage regulators, power quality and regulators for Peterson-Coils.
- 49(0)911 6281 08-0
- info@a-eberle.de
- Frankenstraße 160
Nürnberg, D-90461
Germany
Filter Results By:
Products
Applications
-
product
Power Quality fix installed / Description
The fault recorders and power quality analyzers PQI-D, PQI-DA and PQI-DA smart are the key devices for all measurement tasks in low-, medium- and high-voltage grid.
-
product
Power Quality mobile / Description
Mobile Power Quality-Analyzers such as PQ-Box 100, PQ-Box 150 and PQ-Box 200 were developed for the operation in harsh environment (protection degree IP65). Both are applicable for measurements in public (CAT IV) and industrial networks for voltages up to 1000V. Analyzers are delivered with WinPQ Mobile, intuitive, user-friendly software package for settings, records extraction and visualization, second to none in its class.
-
product
Voltage Regulation & TransformerMonitoring
One of the essential features of the voltage regulators is the possibility to implement special functions via customer-specific programs without interfering with the firmware of the regulator. The programs can be created online using a simple editing tool. All necessary program elements, incl. help texts and sample program lines, are included with every regulator.
-
product
Low Voltage Regulation
The low voltage regulation system LVRSys represents a cost effective alternative for grid expansion. The economic use is recommended in all low voltage grids where short-circuit power is sufficient, but have voltage maintenance problems.
-
product
SCADA Communication
From a technical point of view, communication is the process of exchanging information between a transmitter and a receiver. To achieve this, the transmitter encodes a message and transmits it to the receiver. The receiver can only decode the message if it knows the protocol. The setup of the communication between A. Eberle IED's (Intelligent Electronic Device) and a SCADA system becomes more easy if all partners communicate in such a way that all queries regarding the protocol are clarified before or during the system design process (at latest before commissioning).