HV Breaker Run-Test System
BI-3 - Xi'an Multipower Technic Co.,LTD (Xi'an)
Before the delivery, the high-voltage breaker should be run in to ensure every breaker with the good mechanical characteristics. The running-in switchgear shall be wiped off the burr of the component by the mutual force and frictions in the no-load operations to amend its shape and to achieve the best cooperation among the components. The concept of running-in has been the mutual understanding of the international leading switchgear manufacturers.