HV Test Transformer
GTU-800KVA/220KV - Wuhan Sangao Electrical Test Installations Limit Co. (Sangao)
SF6 gas -filled testing transformers are especially designed for GIS in the factory and on-site test,and for testing all GIS switchgears and GIS components such as insulators,insulating tension pole,GIS voltage transformer and so on,the PD test can be performed under the general environment because of the merits of encapsulation ,the PD level of our equipment can be lee than 3pC,and it can be added a HV bushing to perform the withstand voltage test at the same time.