Automotive Battery Production Line Tester
Digatron Power Electronics (Digatron Power Electronics)
The Production Line Tester (PLT) is typically installed at the end of battery production lines (finishing). An electrical load test after formation charging is essential to assure performance and quality. The energy discharged during this test must be minimized to eliminate the need for recharging after testing.