Showing results: 121 - 135 of 623 items found.
-
EUROSMC, S.A.
High current injection units for primary testing of over current relays and circuit breakers.
-
T&R Test Equipment Ltd.
Our range of units covers applications up to 200A and includes single phase and three phase units with applications for testing and timing of IDMT relays, thermal overloads, MCB’s and auto-reclosers.
-
16814 -
Ultra-Tech Enterprises, Inc.,
The MU Locomotive Trainline/Cable Test System (MU Test System) can perform shorts testing, continuity testing, and ground-leakage testing on each of the 27 pin Multi-Unit Trainlines normally found on Freight Locomotives. The MU Test System is comprised of two identical tester units. Each unit is installed in a rugged, water resistant Pelican case. Each unit contains an MU cable receptacle that mates with a 27 pin MU jumper cable. A snap-on vinyl pouch on the outside cover of each unit provides storage for the battery charger/power adapter and the chassis test lead. The enclosure cover hinges separate from the test unit as the cover is opened; this removes the cover completely to allow free access to the MU cable receptacle and the control panel.
-
JKI
Caraya is a new experimental open source assertion and unit testing framework for LabVIEW. It takes a whole new approach to unit testing; your VI is your test. Caraya allows you to convert your manual test VIs you use for debugging into unit test cases with nearly no effort. Even running the tests is easy, just run the test case VI. Caraya significantly lowers the barrier for developers to write unit tests leading into improved overall code quality in real-world projects where developers don’t always have the luxury to write unit test cases first.
-
EUROSMC, S.A.
The Raptor system consists of a main ‘master’ unit and a number of optional units that enable the execution of virtually any commissioning or routine testing jobs on the primary equipment of medium and high voltage electricity installations.
-
TA-245 -
Tech-Aid Products
This is the Main Air Data Test Fixture as shown in the AZ-241 repair manuals and will allow by the book testing of the units.
-
PI-5000 -
ETI Precision
The PI-5000 is composed of the PI2500 and the AUX-5000 auxiliary output unit, which when combined gives the unit the capability of testing 4000 ampere breakers, with essentially the same specifications as the proven PI-4000B. The auxiliary unit is smaller than the PI2500, so it can also be maneuvered easily in tight spaces, or lowered into shafts and manholes that would not be possible with a larger single piece unit.
-
E447 -
EMO Systems Canford Audio PLC
Similar to E445 but without jack and RCA (phono) testing facilities. Includes special XLR remote unit to enable testing of cables where it is not possible to bring both ends to the tester.
-
MT-3551T -
Kongter Test & Measurement Co., Limited
It is multi-functional in field testing for power meters and metering units of all wirings. Testing functions include: metering unit and power meter. With these function, it is widely used in power utility, substation, telecom machine room and the alike for power consumption examination, circuit breakage inspection, power abnormality analyzing, asset management and industrial production management.
-
California Scientific, Inc.
CSI's modulated fiber optic sources are optimized for high-speed modulation up to 12.5 Gbps. The units are intended to be modulated by a pattern generator for testing the performance of optoelectronic components such as photodetectors and receivers. They are powered by wall plug units.
-
Parker Hannifin Corp.
Parker's compressed air testing units provide a cost-effective means of quickly evaluating compressed air for the presence of microbes. The units are lightweight, ergonomically designed for ease of use, and supported by Parker's global sales and service network.
-
Eye-BERT Gen2 -
Spectronix
The Eye-BERT Gen2 builds on our original Eye-BERT, adding extended data rates, mixed mode testing capability, and a color touch screen. The extended data rate allows for testing of links in the 125Mb to 11.4Gb range all in a single unit. The Eye-BERT Gen2 offers high performance stand alone bit error rate testing at a fraction of the cost of competing testers. Its small size and stand alone operation allow for convenient field testing of SFP and SFP+ transceivers as well as link verification and performance testing all in a single unit.
-
V&V Services -
Rapita Systems Ltd.
*Unit and integration testing*System and acceptance testing*DO-178 process definition and optimization*Test automation*Timing analysis and optimization*On-target problem solving*Third-party software verification*Assurance services
-
BTS 200 -
Altanova Group
This testing and maintaining battery system allows to perform measurement of battery voltage, discharging current test and testing of battery capacity. BTS 200 can be connected with external load unit ELU 200.
-
Keystone Compliance
Vibration testing is essential to determining the ability of a product to withstand the conditions that it might experience either during operation or transit. As important as vibration testing is, selecting the right vibration lab to work with is even more important. It is common for units to be over-tested or improperly fixtured. An incorrect fixture can either mask problems with a unit or create a failures that do not actually exist. Proper vibration fixturing is crucial and something that the dynamics testing team at Keystone Compliance is very experienced with.